Homepage

Bayern        Bremen         Hessen        Niedersachsen       Nordrhein-Westfalen       Sachsen-Anhalt      Thüringen

Home

What's new? Search Contents Contact Imprint


  
About Us
    History
    Tasks
    Organization
   
Directions

  The Weser river basin

  Water Framework Directive

  Flood Directive

  Downloads

  Weser photos

[Homepage]-[About us]-[History]
History and work in the past
  Geschäftsstelle Weser

2009

Publication of the river basin management plan and the programme of measures 2009 of the RBC Weser

Conclusion of the model project AGRUM Weser

2008

Publication of the draft river basin management plan 2009 of the RBC Weser for public consultation

Summary of the draft programme of measures 2009 of the RBC Weser

2007

Publication of the public consultation document on "Significant Water Management Issues of the Weser River Basin"

Publication of the summary report of the "Monitoring Programme of the Weser River Basin"

2006

Publication of the "Timetable and work Programme of the Weser River Basin"

2005

Publication of the "Art. 5 Report of the Weser River Basin"

2003

Administrative agreement concluded regarding Flussgebietsgemeinschaft Weser, including accession of the regional states of Bavaria and Saxony-Anhalt
Wassergütestelle Weser was renamed Geschäftsstelle Weser

2002

An early warning plan was elaborated for the Weser

2001

Flood protection measures were taken for the Weser river

Structures were defined for implementation of the Water Framework Directive in the Weser river basin

2000

ARGE Weser conference entitled "Salt pollution in the Werra: measures, consequences and the way forward"

A 2000-2001 action plan known as "With the Weser into the 21st century" was elaborated for the Weser river basin

1999

Ministerial meeting at which a salt pollution reduction agreement was adopted and a draft action plan for the Weser river basin was presented (for 2000-2001)

1998

Water body morphology mapping project completed

1996

Realization of a project aimed at reintroducing migratory fish into the Weser catchment area

Realization of an ecological master plan for the Weser River, as well as a master plan for the Weser's floodplains and headwaters

1993

Establishment of Wassergütestelle Weser (Weser River Office of Water Quality Management)

The 1964 Statute was replaced by an ARGE Weser administrative agreement

1992

Pact concluded between the federal government and regional states aimed at reducing salt pollution from potash mining in Thuringia

1991

Regional state of Thuringia joins ARGE Weser

1989

Completion of initial action plan

 
 
 
   

1982

Weser environmental load plan

1976

Bilge oil collection agreement concluded

seit 1975

Weser monitoring program (known until 2002 as the Weser quality monitoring program), which publishes its results annually

1974

Weser thermal load plan

1965

First in a series of studies of the Weser river

back to top of page