Homepage

Bayern        Bremen         Hessen        Niedersachsen       Nordrhein-Westfalen       Sachsen-Anhalt      Thüringen

Home

What's new? Search Contents Contact Imprint

 

  Pilot projects

    Pilot projects in the regional
   states

        Agriculture   

        River continuity amelioration   

        Cost effective measures

    AGRUM Weser

[Homepage]-[Water Framework Directive]-[Pilot projects]-[Pilot projects in the regional states]
Pilot projects in the regional states
  WFD Pilot projects in the regional states

0 -

SWIFT-WFD case study of the Aller river

1 -

Wümme model project

2 -

Leine-Westaue pilot/model project

3 -

Leine-Ilme pilot/model project

4 -

Mittlere Leine pilot/model project

5 -

Hamel spawning grounds model project

6 -

Aller pilot/model project

7 -

Hunte pilot/model project

8 -

Marsh water pilot/model project

9 -

Tide-Weser model project

10a -

SILVAQUA Oker model project

10b -

SILVAQUA Plus Oker model project

11 -

Interreg III: Aller-Ise

12 -

"WAgriCo - LIFE" - Water resource management in the Großen Aue

13 -

Integrated groundwater body monitoring in the Harz region

14 -

Rhume model project

15 -

Measures needed to move toward implementation of the Water Framework Directive in Bremen

16 -

River continuity pilot project for the Fulda, Eder, Schwalm

17 -

Werra salt effluent pilot project

18 -

Floodplain renaturing with a view to reviving the Werra river between Sallmannshausen and Wartha

19 -

Rehabilitation of the Walse river

20 -

Renaturing of the Ulster river using the Buttlar land consolidation method

21 -

Substance discharge from agricultural land (VERSTOLA) in Thuringia

22 -

Improvement and networking of Werra river aquatic habitats

23 -

Model management in Thuringia: the Hasel model area

24 -

Application of the ATV quality model to the upper Werra river

25 -

Water Framework Directive information database in Lower Saxony

 
   

back to top of page